ashton and i have been super busy these past few days. we've made a lot of progress on the kitchen, but we still have a lot left to do! and because of that, i'm not going to show all of the pictures on this post. here's the deal... we're replacing countertops, backsplash and the floor, as well as repainting the walls, so we didn't tape or cover anything in the kitchen when we painted the cabinets. there's currently paint all over the place, so while the cabinets look excellent, the pictures don't do them justice because everything else looks so messy right now. i'll show you some pictures of us working, and 2 teaser pictures of cabinets, and hopefully we'll be able to show the completed kitchen by the end of next week (or maybe by the end of our spring break, depending on how much time we have).
so with that being said, let's look at pictures! :)
removing cabinets and drawers, and all of the hardware that goes with them. |
our door-less cabinets. |
we took a little detour and removed some of the backsplash along the way. |
painting the doors and drawers in the backyard. |
we've gone from this...
to this...
we have stuff in our cabinets!! the bookshelf is almost cleared off. yay! :) |
ashton has also put on his electrician hat this past week and worked on some projects... got the dishwasher and garbage disposal working, as well as replaced an element on the hot water heater (we apparently purchased a faulty one).
also, i promise i help ashton with all of these projects. i'm just more concerned about taking pictures than he is... thus, why he is in most of the pictures. :) he did take a few of me, but i'm holding off on sharing those because they show more of the kitchen. we work really well as a team (if i do say so myself), sometimes splitting up a project, depending on our strengths (i put in the shelf paper, he painted touch ups) or we work together (i screwed the hinges on to the cabinet doors, he screwed the doors back on the cabinets).
future projects...
- i ordered our cabinet hardware on friday, so that will hopefully be delivered soon so we can install all of the knobs and drawer pulls.
- remove and replace drywall where the backsplash was.
- remove the old countertops.
- i also ordered our backsplash, so that should be coming soon too (but won't be installed until after our countertops are installed).
- we also decided to change our door knobs and hinges for our interior doors to a bronze door knob (because we like those better and it matches our exterior door knobs). we ordered those last week, and received them on monday. our bedroom and bathroom door are the only two doors that have been painted, so we installed the new door knobs on those two and are just waiting for the new hinges (coming with the cabinet hardware) to actually hang the doors back up.
- and quite possibly most exciting of all... our countertops are officially scheduled to be installed on march 1. (why, oh why, is it leap year this year? i don't want to wait an extra day!) we were originally told march 1, and then lowe's changed it to march 31, but the contractor remembered talking to me when he came out to measure about how we were very ready to have the countertops and sink installed, so he was able to schedule us early when a day opened up. yay contractor! :)